Looking back at a standout project from 2014 to 2016, Acres was the contractor of choice for the Merritt Green Energy Biomass Plant. In Phase 1, Acres took the lead in early works construction, providing early works construction including site stripping and leveling, installed critical underground utilities, and set robust concrete foundations for all buildings and structures.
We moved an impressive 60,000 cubic meters of earth, installed 450,000 kg of reinforcing steel, poured 3,000 cubic meters of concrete, and laid 2 kilometers of water line.
Total scope of work included:
- Underground utilities
- Siteworks including earthworks, grading and site surfacing
- Building foundations
- Building slabs
- Heavy equipment foundations
- Concrete walls
- Underground electrical work