Glenmore Landfill Area 3 Liner

THE PROJECTS

Project A:
Area 3 Liner. Scope of work includes construction of a new cell that includes earthworks, installation of an engineered liner system for a new cell that ties into an existing cell liner, and leachate collection system complete with riser pump system. In addition, road construction, paving and utility installation that includes a leachate forcemain, landfill gas, storm culverts, and electrical.

Project B:
Compost Area Paving and Electrical Upgrades. Scope includes extension of the base prep and paving, electrical conduit and streetlighting in the compost area.

Project C:
Landfill Gas Repairs. This project includes work required to repair the landfill gas system that was damaged during the 2023 McKinney wildfire. Works include removal and replacement of HDPE landfill gas piping and laterals.

LOCATION: Kelowna, BC

PROJECT DATES: January 2024 – Ongoing