Predator Ridge Parcel P – Parts A & B

THE PROJECT

The project was constructed through a steep and difficult rock cut, which required attention to blasting and construction practices to avoid large rock to roll down the steep slopes onto the active golf course. The project was a success, due to open dialogue with the consultants, client and subcontractors, with flexibility to adjust as needed. The project was completed on time and on Budget.

Deep utilities installation (sanitary, storm and watermain), PVR (pressure reducing kiosk), shallow utilities, full road works – base gravels, curb and gutter, multi-use path, asphalt.

“Things that really stood out for us with Acres is their willingness to listen and understand our business. I was so impressed with the balance between technology and the finished product. Their pricing was always competitive, and pricing is always important, but everyone knows that with a good partnership and when people work well together, great stuff happens.”

Brad Pelletier, Wesbild Okanagan

LOCATION: Vernon, BC

COMPLETION DATE: October 2023

If you are curious about how we do business, thinking of a future project, or ready to break ground now: