Kelowna Gyro Forcemain

Kelowna Gyro Forcemain

Kelowna Gyro Forcemain THE PROJECT The project was a replacement of a large diameter forcemain in the busy downtown streets of Kelowna, running from a lift station at Gyro beach and continuing along KLO and Okanagan College. Major project risks and challenges were...
West Quesnel Land Stability Phase 2

West Quesnel Land Stability Phase 2

West Quesnel Land Stability Phase 2 THE PROJECT The project consisted of road and drainage improvements, which included the installation of approximately 2.4 kilometers of storm main, 200mm to 1200mm in diameter with a combination of concrete precast, cast in place...
Aerated Static Pile Composting System

Aerated Static Pile Composting System

Aerated Static Pile Composting System THE PROJECT This project included a wide range of activities aimed at preparing and developing the site for full operational capacity. The scope includes initial planning, site preparation, utility installation, and final system...