Kitchen Annex – Vernon Military Camp THE PROJECT Complete construction of a wood framed 4,125 sq. ft. building. This kitchen facility includes a loading dock, walk in coolers, and ample prep space. Acres was involved in every stage of this project from the...
Tobiano Water Treatment Plant Upgrades THE PROJECT This project involved upgrades to the Tobiano Water Treatment Plant, with the aim of enhancing efficiency and capacity. This included concrete works, installation of treatment unit, mechanical piping, electrical...
West Quesnel Land Stability Phase 2 THE PROJECT The project consisted of road and drainage improvements, which included the installation of approximately 2.4 kilometers of storm main, 200mm to 1200mm in diameter with a combination of concrete precast, cast in place...
Glenmore Landfill Area 3 Liner THE PROJECTS Project A:Area 3 Liner. Scope of work includes construction of a new cell that includes earthworks, installation of an engineered liner system for a new cell that ties into an existing cell liner, and leachate collection...
Aerated Static Pile Composting System THE PROJECT This project included a wide range of activities aimed at preparing and developing the site for full operational capacity. The scope includes initial planning, site preparation, utility installation, and final system...
Recent Comments