Kelowna Gyro Forcemain THE PROJECT The project was a replacement of a large diameter forcemain in the busy downtown streets of Kelowna, running from a lift station at Gyro beach and continuing along KLO and Okanagan College. Major project risks and challenges were...
Glenmore Landfill Area 3 Liner THE PROJECTS Project A:Area 3 Liner. Scope of work includes construction of a new cell that includes earthworks, installation of an engineered liner system for a new cell that ties into an existing cell liner, and leachate collection...
Aerated Static Pile Composting System THE PROJECT This project included a wide range of activities aimed at preparing and developing the site for full operational capacity. The scope includes initial planning, site preparation, utility installation, and final system...
Predator Ridge Parcel P – Parts A & B THE PROJECT The project was constructed through a steep and difficult rock cut, which required attention to blasting and construction practices to avoid large rock to roll down the steep slopes onto the active golf...
Recent Comments