Kelowna Gyro Forcemain

Kelowna Gyro Forcemain

Kelowna Gyro Forcemain THE PROJECT The project was a replacement of a large diameter forcemain in the busy downtown streets of Kelowna, running from a lift station at Gyro beach and continuing along KLO and Okanagan College. Major project risks and challenges were...
Glenmore Landfill Area 3 Liner

Glenmore Landfill Area 3 Liner

Glenmore Landfill Area 3 Liner THE PROJECTS Project A:Area 3 Liner. Scope of work includes construction of a new cell that includes earthworks, installation of an engineered liner system for a new cell that ties into an existing cell liner, and leachate collection...
Aerated Static Pile Composting System

Aerated Static Pile Composting System

Aerated Static Pile Composting System THE PROJECT This project included a wide range of activities aimed at preparing and developing the site for full operational capacity. The scope includes initial planning, site preparation, utility installation, and final system...
Predator Ridge Parcel P – Parts A & B

Predator Ridge Parcel P – Parts A & B

Predator Ridge Parcel P – Parts A & B THE PROJECT The project was constructed through a steep and difficult rock cut, which required attention to blasting and construction practices to avoid large rock to roll down the steep slopes onto the active golf...