West Quesnel Land Stability Phase 2 THE PROJECT The project consisted of road and drainage improvements, which included the installation of approximately 2.4 kilometers of storm main, 200mm to 1200mm in diameter with a combination of concrete precast, cast in place...
Glenmore Landfill Area 3 Liner THE PROJECTS Project A:Area 3 Liner. Scope of work includes construction of a new cell that includes earthworks, installation of an engineered liner system for a new cell that ties into an existing cell liner, and leachate collection...
Aerated Static Pile Composting System THE PROJECT This project included a wide range of activities aimed at preparing and developing the site for full operational capacity. The scope includes initial planning, site preparation, utility installation, and final system...
Predator Ridge Parcel P – Parts A & B THE PROJECT The project was constructed through a steep and difficult rock cut, which required attention to blasting and construction practices to avoid large rock to roll down the steep slopes onto the active golf...
Predator Ridge OVERALL RESORT COMMUNITY WORK Land development – civil earthworks, roads, utilities, and heavy equipment. WHY ACRES? Experienced Flexible Long history This is a successful project because Acres is experienced in heavy civil projects and is able...